9525 Woodland Hills Way Tallahassee, FL 32309
4 Beds
5 Baths
6,679 SqFt
UPDATED:
Key Details
Property Type Single Family Home
Sub Type Detached Single Family
Listing Status Active
Purchase Type For Sale
Square Footage 6,679 sqft
Price per Sqft $471
Subdivision Woodland Hills
MLS Listing ID 386217
Style Traditional/Classical,Farmhouse
Bedrooms 4
Full Baths 4
Half Baths 1
Construction Status Brick 4 Sides
HOA Fees $1,000/ann
Year Built 2002
Lot Size 42.060 Acres
Property Sub-Type Detached Single Family
Property Description
Location
State FL
County Leon
Area Ne-01
Rooms
Family Room 22x16
Other Rooms Foyer, Pantry, Porch - Covered, Study/Office, Utility Room - Inside, Walk-in Closet, Bonus Room
Master Bedroom 25x14
Bedroom 2 19x14
Bedroom 3 22x17
Bedroom 4 14x18
Living Room 19x13
Dining Room 20x13 20x13
Kitchen 26x16 26x16
Family Room 22x16
Interior
Heating Central, Electric, Fireplace - Gas, Heat Pump
Cooling Central, Electric, Fans - Ceiling
Flooring Carpet, Tile, Hardwood
Equipment Dishwasher, Disposal, Microwave, Refrigerator w/Ice, Irrigation System, Range/Oven
Exterior
Exterior Feature Traditional/Classical, Farmhouse
Parking Features Carport - 3+ Car
Pool Concrete, Pool - In Ground, Owner
Utilities Available 2+ Heaters, Gas
View Green Space Frontage
Road Frontage Maint - Private, Paved
Private Pool Yes
Building
Lot Description Separate Family Room, Great Room, Kitchen with Bar, Kitchen - Eat In, Separate Dining Room, Separate Kitchen, Separate Living Room
Story Bedroom - Split Plan, Story - Two MBR Down
Level or Stories Bedroom - Split Plan, Story - Two MBR Down
Construction Status Brick 4 Sides
Schools
Elementary Schools Roberts
Middle Schools William J. Montford Middle School
High Schools Chiles
Others
HOA Fee Include Common Area,Maintenance - Road
Ownership Erwin
SqFt Source Other
Miscellaneous 9 + Foot Ceilings,Cathedral/Vault/Tray,Deck,Fenced,Tub - Garden,Gated Community,Patio,Some Wind Treatments,Septic Tank,Horse Potential,Gated Driveway
Acceptable Financing Conventional, FHA, VA, Cash Only
Listing Terms Conventional, FHA, VA, Cash Only